The JAMS2000 job generates and prints a summary of the Jobs which should run between any two points in time.

Parameters

System I.D.

Only Jobs in the System specified by this parameter are printed. If you leave this parameter blank, Jobs in all Systems will be printed.

Start Date/Time

These two parameters specify the starting date and time of the period for which a schedule should be generated.

End Date/Time

These two parameters specify the ending date and time of the period for which a schedule should be generated.

Description

This Job generates a report of the Jobs which should run between any two points in time. This report is for informational purposes only. The Jobs on this report will not be submitted.

This report is produced by examining the Setup and Job definitions. All Setups and Jobs which specify a Scheduled Date which would fall into the specified date range will be included on this report. The report is not limited to recurring Jobs.

Example 3-8 is a sample of this report.

Example 3-8 JAMS2000 Report

Job Access & Management System (JAMS)                             Page:        1 
Scheduled Jobs Between Two Dates                                  Date: 04-02-91 
                                                                  Time: 09:06 PM 
System I.D.   Description 
------------  -------------------------------------------------- 
AP            Accounts Payable                                  
 
 Setup Name: JAP130 
 Description: Print Checks                                      
                                                                
Schedule For: THURSDAY  
Non-Workday processing D (S = Schedule, D = Defer, I = Ignore) 
 
Scheduled to run at  4-APR-1991 15:00:00.00 
Scheduled to run at 11-APR-1991 15:00:00.00 
 
 Setup Name: JAP120                                 
 Description: Cash Requirements                                  
                                                                
Schedule For: THURSDAY                                                    
Non-Workday processing D (S = Schedule, D = Defer, I = Ignore) 
 
Scheduled to run at  4-APR-1991 10:00:00.00 
Scheduled to run at 11-APR-1991 10:00:00.00 
 
 Setup Name: JAP110                                 
 Description: Post Invoices                                     
                                                                
Schedule For: DAILY                                                       
Non-Workday processing I (S = Schedule, D = Defer, I = Ignore) 
 
Scheduled to run at  1-APR-1991 19:00:00.00 
Scheduled to run at  2-APR-1991 19:00:00.00 
Scheduled to run at  3-APR-1991 19:00:00.00 
Scheduled to run at  4-APR-1991 19:00:00.00 
Scheduled to run at  5-APR-1991 19:00:00.00 
Scheduled to run at  8-APR-1991 19:00:00.00 
Scheduled to run at  9-APR-1991 19:00:00.00 
Scheduled to run at 10-APR-1991 19:00:00.00 
Scheduled to run at 11-APR-1991 19:00:00.00 
Scheduled to run at 12-APR-1991 19:00:00.00 
 

  1. The name and description of the Setup definition which is scheduled to run during the requested period of time.
  2. The schedule definition.
  3. A list of the dates and times on which this job should run.
  4. This Setup is scheduled to run daily but is ignored on non-workdays. Note that the 6th and 7th (Saturday & Sunday) are skipped.